Thursday, December 4, 2014

A reflection from 9th International PMI Poland Chapter Congress - Megaprojects challenges by Virginia A. Greiman

I had a pleasure to open this year’s International PMI Poland Chapter Congress, held 24-25 November in Radisson Blue, Warsaw and gathered 300 delegates.

To summarize the event let me quote two keynote speakers.

"This was the best conference I've attended. The content was terrific. People were friendly and welcoming. Speakers has opened my mind to things I was not aware of. That was a tremendous event". Virginia A. Greiman

“I wanted to thank you all very much for your professionalism and hospitality! I spent a couple of wonderful days, where everything was so professionally prepared by you that I could focus on delivering my speech and message, which was the ultimate goal! Please extend my thanks and congratulations to the rest of the team” Eduardo Braun.

This year’s participants could choose between two thematic paths: “Megaprojects – Mega Challenges” and “Beyond Agile”. A lot of great speakers and topics, fruitful networking thanks to Grzegorz Turniak and BNI and a lot of inspiring people. 

In my next few posts I would  like to focus on a few sessions I have attended. Let's start from an opening keynote speaker.

The event was kicked off by  Virginia A. Greiman, a Great Woman who I really admire not only for what she does but mainly for who she is – thank you Virginia, I’m very lucky to meet you in person.

Virginia A. Greiman, professor in the management of Megaprojects and Planning at Boston University, holds academic appointments at Harvard University Law School, and Harvard Kennedy School of Government. She lectures and teaches internationally and her published research focuses on innovation megaprojects, project complexity and sustainability and program governance. She has held executive and advisory positions with several of the world’s largest megaprojects including Boston’s Central Artery/Tunnel Project, California’s High Speed Rail Project, the UK’s Crossrail Project. Her recently published book is entitled: Megaproject Management: Lessons on Risk and Project Management from the Big Dig, John A. Wiley & Sons, Publishers, New York, London, Hoboken.


Virginia started her speech titled “Global challenges of mega-projects” from the definition of a megaproject: “any project of $1 billion or more in size, or projects of a significant cost that attracts a high level of public attention or political interest because of substantial direct and indirect impact on community, environment, and state budgets.” Federal Highway Administration.
I like the definition of Altshuler’s she has shared: “Initiatives that are physical, very expensive , and public.”

Then she moved to the definition of success? Time & Budget? Goal? Or Sustainability? Measuring the success of a megaproject is not linear. There are twists and turns not only in terms of engineering and the emergence of new technology, … but in the moving target of public expectations.”


Some take aways from the presentation:
  • Megaproject investments are for future generations as real worth takes decades.
  • Megaprojects require “Transparent Systems” due to their complex, interrelationships with the communities and the citizens it servers.
  • Integration is crucial. On Central Artery/Tunel 10 Programs have been integrated – for details see the picture – Top 10 Programs.
  • Sustainability is more important than iron tringle (cost, time, scope). Megaprojects always cost more! We need to accept it!
  • Sustainability is multidimensional and extends to economic, social, financial, technological, institutional and environmental benefits!
  • Use megaprojects as opportunities! Opportunities to extend your technological approach. Opportunities to reduce poverty in developing countries, to build schools, find the cure etc.. Megaprojects can be Transforming – Seize the Moment!!!
  • Extend your planning stage as long as you can. Develop more sharing knowledge and goals. Set other performance based measurements than schedule - you cannot achieve sustainability through speed.
  • The greatest challenge in megaprojects is politics. Dealing with consistency is crucial. Change management for project managers is essential skills. If you want to solve a problem start a project!


PMI Poland Chapter members can access the recording of Virginia’s presentation here.


More about Megaprojects’ path can be found in the article (in Polish).

Thank you very mych all PMI Poland Chapter volunteers for make it happen. Great job! Well done!


Tuesday, November 4, 2014

AgilePMO is celebrating 2 years! Refleksja z Phoenix.

I cannot belive it's already 2 years! 2 years and 60 articles, that means 2,5 posts per month, can be better, ideally 1 post per week, that's the target for next year. Thanks a lot all of you who read and comment my blog. The rest of the article will be in Polish as I would like to share my very personal thoughts from LIM in Phoenix which I've already shared in English here.

Source: www.freedigitalphotos.net by Stuart Miles

W ostatnim tygodniu miałam przyjemność uczestniczyć w  PMI Leadership Institute Meeting (LIM) w Phoenix (Arizona), USA, w którym uczestniczyło ponad tysiąc liderów z całego świata.

Dla mnie był to już czwarty LIM, ale pierwszy w Stanach Zjednoczonych i szczególnie ważny, gdyż w imieniu PMI Poland Chapter odbierałam nagrodę.


Po raz kolejny PMI Poland Chapter został doceniony i nagrodzony. W październiku 2013 zostaliśmy laureatem nagrody "Chapter of the Year", najbardziej cenionej nagrody przyznawanej przez Zarząd PMI Global za doskonałe wyniki w działalności i rozwoju organizacji. Natomiast w tym roku, ponownie, jako jedyny chapter w Europie, PMI Global wyróżnił nas, tym razem w kategorii "Collaboration and Outreach", czyli za osiągnięcia w zakresie współpracy i spektrum działania. Między innymi doceniono jedenastoletnią już inicjatywę oddziału gdańskiego English Summer/Winter Camp, oraz kilkuletni program Project Management at School.

Nagroda została wręczona na oficjalnej gali: "2014 PMI Community Awards Ceremony. Continuing on a Path to Excellence".

LIM odbywa się zawsze bezpośrednio przed kongresem PMI i jest połączeniem wystąpień światowej klasy ekspertów oraz wolontariuszy i pracowników PMI, którzy dzieląc się swoją wiedzą i doświadczeniami wspierają rozwój zarówno oddziałów PMI jak i wolontariuszy. W tym roku podczas LIM mieliśmy okazję wysłuchać Toma Petersa, Eduardo Brown czy Kevina Carrolla.

Management guru Tom Peters, autor wielu książek i współautor  "In Search of Excellence" przedstawił 42 podpowiedzi, wspierające dążenie do doskonałości. Prezentowane materiały, jak i wiele innych dostępne są na stronie tompeters.com.

Edwardo Brown w  wystąpieniu „How to Become an Effective Leader” podzielił się z nami wypowiedziami liderów z całego świata: Bill Clinton, Francis Ford Coppola, Gary Hamel, Jack Welch, Rudy Giuliani, Jim Collins, Dave Ulrich, Tony Blair czy Colin Powell. Wszyscy jednogłośnie podkreślili znaczenie kultury organizacyjnej, wizji, ludzi, komunikacji i podejmowania decyzji. Edwardo jest gościem tegorocznego 9-tego Międzynarodowego Kongresu PMI Poland Chapter, na który serdecznie zapraszam.

Osobiście miałam okazję wystąpić w sesji „Mentoring College Teams and Students Through the Enactus Program”, w której to podzieliłam się swoimi doświadczeniami z bycia mentorem najlepszego zespołu w Polsce, zespołu Uniwersytetu Gdańskiego przy Kole Naukowym Strateg. PMI Poland Chapter jako pierwszy chapter z poza Stanów Zjednoczonych na początku roku 2014 nawiązał współpracę z Enactus. Więcej na temat tej współpracy można przeczytać tutaj.

To nie koniec polskich akcentów w Phoenix, podczas gali PMI Professional Awards warsztat Scrum Droid firmy Octigo otrzymał nagrodę w kategorii najlepszy produkt edukacyjny. Serdecznie gratulujemy Octigo i zapraszamy na warsztat trzeciego dnia Kongresu.

Na mnie największe wrażenie zrobiło jednak wystąpienie Kevina Carrolla zatytułowane “Play@Work: Unleashing Growth Through Creativity and Innovation”. Wzruszająca  historia, począwszy od trudnego dzieciństwa, poprzez odkrycie i zatrudnienie przez Nike w roli „Katalizatora”, którego zadaniem było budowanie kultury wspierającej kreatywność i innowacyjność, a skończywszy na propagowaniu idei „ Global Game Changers”. Kevin przekonywał, że każdy z nas, każdego dnia może komuś pomóc, nasze działanie może być niewielkie, ale połączony wysiłek wywrze ogromny skutek. Podkreślił również znaczenie „przynależności” w naszym życiu. Od dziecka pragniemy przynależeć do większej części, chcemy być włączani, a nie wykluczani. Słysząc te słowa poczułam się niezwykle szczęśliwa i dumna, że przynależę do jednej z najwspanialszych społeczności na świecie.

Dziękuję wszystkim Wolontariuszom PMI, za Waszą energię, inspirację i ciężką pracę, a przede wszystkim za Waszą nadzwyczajność, bo zwyczajni ludzie nie zmieniają świata, a my to wspólnie robimy!


„Ordinary will not change the world. We need to be extraordinary’ Kevin Carroll.


Friday, October 31, 2014

Be extraordinary! Ordinary will not change the World! A Reflection from PMI LIM Phoenix.

Last week (23-25 Oct) more than 1000 PMI leaders gathered together in Phoenix (Arizona), USA at the PMI® Leadership Institute Meeting (LIM) 2014 - North America. This was a fourth time I have attended this 3-day learning and sharing experience, but for the first time in North America (before just EMEA).

Leadership Institute Meetings are designed to inspire and support PMI leaders by offering face-to-face opportunities to connect with and learn from fellow volunteer leaders. At the meetings PMI leaders collaborate in productive, curriculum-driven educational sessions. Additionally, they earn professional development units (PDUs) for the formal learning activities related to project management. This time, colleagues at home could watch both live and on demand sessions via the Virtual LIM. The opening sessions and keynote have been streamed live from Phoenix, plus live breakouts have been recorded  and available on-demand for 90 days following LIM at no charge for PMI members. For more please use this link.

For me LIM is more than a conference.  This is a very inspiring and motivating event with focus on networking and exchanging experience. And this time that was even more special and emotional due to the fact that on behalf of PMI Poland Chapter I had a pleasure to accept a community award for “Collaboration and Outreach”. Our chapter was the only chapter from Europe to be awarded.


Let’s start the write up on LIM from a closing keynote speaker this time. Kevin Carroll, who was discovered and hired by Nike simply to act as “Katalyst”—someone who builds a culture of innovation where creative ideas are turned into reality. Energetic and humorous, Carroll deftly combines an anecdotal narrative with strategies for discovering new and creative ways of thinking and problem solving to help build mission-oriented teams.

In his speech “Play@Work: Unleashing Growth Through Creativity and Innovation” Kevin stressed the importance of belonging and connecting, to be inclusive is crucial. I feel so proud to belong to one of the best community in the word. Thank you very much all PMI Poland Chapter volunteers, special thanks to all branches. Guys, you really made my day!


A few more take aways from Kevin:
  • You can’t change where you are from, but you can change where you are going.

Kevin shared his story and highlighted that as a part of our job as PMI volunteers, by supporting local communities, every day, we can impact someone’s life. I can share a lot of examples like Sebastian’s growth, one of the Gdansk orphans, thanks to participation in English Camps organized for 11 years by PMI Poland Chapter Gdansk Branch, volunteers, novice to project management when joined the community and now certified, fully fledged pm professionals with career prospects and hundreds more…
  • Read! Reading books makes you happy! Some recommendations here.
  • Play! More play means more innovation, more critical thinking and problem solving! In 1 hour play you can discover more about a person than in one year od conversation.
  • Inspire…………………
  • Dream: Dedication, Responsibility, Education, Attitude, Motivation
  • Act! Your action might be small but the collected impact will be great!
  • Be extraordinary! Ordinary will not change the World!

Monday, October 27, 2014

10 Cardinal Sins of Project Sponsorship

Before we move to the core subject I would like to share some staticstics - source: PMI’s Pulse of the Profession

ON TARGET
81% of projects at high-performing organizations— those that complete 80% of projects on time, on budget and within original goals—have active sponsors. At low-performing organizations, just 45% of projects have active sponsors.
ON STRATEGY
66% of strategic initiatives are successful when they have actively engaged sponsors. Without active sponsors, just 41% of strategic initiatives are successful.
ON ORGANIZATIONAL CHANGE
81% of organizations that are highly effective with organizational change report frequently using executive sponsors on their strategic initiatives, compared to only 25% of organizations minimally effective.
ON COMPLEXITY
When it comes to complexity in projects, a sponsor who actively supports the project is the second factor with the greatest impact on the success of projects—second only to effective communication.


1.    Lack of leadership
Leaders should lead. And this does not apply to Project Manager but to a skilled executive sponsor! Each project should have such a sponsor who is responsible for inspiring, promoting collaboration, decisions & consensus!
  • Ensure that there is clarity about the aims and objectives of major projects, and there are clear criteria against which success of a project can be judged.
  • Clearly articulate the business case or rationale for why this change is needed
  • Communicate how this project relates to the overall vision, strategy, and mission of the organization
  • Communicate strong ownership and personal commitment for this project 

2.    Environment not supporting the project work
  • Create an environment within the organization in which project management can succeed: trust, open dialog, collaboration, creativity, sharing ideas, championing issues, taking decisions, keeping promises.
  • Run emotions high. Nothing affects project value more than the organisational culture. Understand the level of your company emotional maturity and constantly work to improve it.
  • Don’t fail to fail..
  • People over process. Create and maintain community – a unified body of individuals with common interests interacting and collaborating! Collaboration creates value.

Source: www.freedigitalphotos.net by Vlado
3.    Not understanding the scale and complexity
  • Consider carefully the scale and complexity of projects to assess whether they are achievable.
  • Estabkish clear priority among project time, cost, and quality specifications
  • Ensure realistic timelines,
  • Break down initiatives  into manageable projects, milestones each delivering an auditable business benefit.
  • Build enough high-level review points  into the project to ensure that it is not allowed to continue if changing circumstances mean that the business benefit is no longer going to be achieved cost effectively.
  • Be aware of the importance of halting a project that has been overtaken by events, rather than continuing to spend money.

4.    Too many active projects
Very often there are too many projects opened as sponsors think that if a project is important needs to be started.
  • The best way to finish a project quickly is to staff it optimally. Fewer projects in portfolio means more stuff completed by the end of the year, so prioritize your projects and start when you have resources.

5.    Lack of flexibility/agility 
“Organizations exist in a constantly changing competitive environment, so scope might need to change, particularly if it’s a very long project.” David West
  • Make sure there are considerable benefits in introducing systems in phases, phase it
  • Anticipate Surprises! Ensure project plans are sufficiently flexible to allow for the insertion of technological advances where relevant

6.    Micromanagement
The shift from micromanagement and looking at the project from a task perspective to team empowerment, self-organisation, self -motivation, trust, authority and ownership are the key to success of today’s complex and risky projects.

Micromanaging is “the cardinal sin of project sponsorship”. When both parties do the work of building trust, outlining roles and responsibilities, and communicating regularly, micromanagement shouldn’t be an issue.

7.    Not proper risk management – both threats and opportunities
  • Ensure decisions on projects, both prior to inception and during development, are based on rigorous assessment of costs and benefits, and a realistic assessment of risks.
  • Make sure there are a risk management framework for projects, within which people are empowered to make decisions as the costs, benefits and risks change during the project’s life
  • Ensure risk assessment is carried out throughout the project, in particular to assess whether the business case continues to be viable in the light of actual incurred and changing business requirements

8.  Lack of high-quality project management skills
The development of high-quality project management skills within the organization is essential. The whole organisation, both sponsors and project managers must speak the same language.

“Just as a doctor might need to translate medical terms for a patient, a project manager can help the sponsor understand things like earned value analysis and critical path.” David West
  • Establish project management as a distinct profession
  • Ensure that principles of good project management are understood and followed throughout the organization
  • Reward project managers for their part in delivering projects successfully
  • Project managers must be encouraged to draw risks to the attention of senior management in order to alert them to problems. They must be encouraged to undertake active management of change to project agreements, costs, benefits, risks, timescales, technology and organization, and not simply adhere to organizational project plans or project management methodologies.

9.    Lack of or poor relations between customer and suppliers
Relations between customer and suppliers have a crucial effect on the success of the project.
  • Maintain a close relationship with suppliers, but avoid undue reliance on them, and maintain overall ownership of progress to achieving the intended benefits.
  • Ensure that all parties have a clear understanding of their roles and responsibilities, and a share understanding of key terms and deadlines
  • Make sure there is an ongoing process of agreement management during the life of the project to allow for the almost inevitable change to requirements.  The aim should be to manage rather than police, project agreements.

10. No lessons learnt gathered
It is essential that organizations learn from past mistakes and consider how they can co-ordinate better their considerable resources to ensure better value for money in the future.

  • Seek to review the success of projects as soon as possible so that lessons can be fed back into consideration of later projects.
  • Ensure reviews are undertaken in a constructive and open manner with the aim of improving future project performance.
  • Make sure reviews should be undertaken from project, portfolio and organisation perspective

Wednesday, October 8, 2014

10 kardynalnych grzechów Sponsora Projektu

Tym razem po polsku, wersja angielska pojawi się wkrótce. English version soon.

1. Brak przywództwa
Przywódcy powinni przewodzić. I nie dotyczy to Project Managerów, ale wprawnych sponsorów strategicznych. Każdy projekt powinien mieć sponsora, który jest odpowiedzialny za inspirowanie, promowanie współpracy, decyzje i konsensus. 
• Zapewnij przejrzystość celów projektowych oraz ustal jasne kryteria sukcesu dla każdego projektu 
• Jasno artykułuj przypadek biznesowy, czy  powód, dla którego zmiana jest konieczna
• Komunikuj jak ten projekt realizuje wizję, strategię i misję 
• Komunikuj odpowiedzialność i personalne zaangażowanie w project.

Żródło: www.freedigitalphotos.net, autor: Stuart Miles

2. Brak kultury wspierającej pracę projektową
• Twórz klimat organizacji, w którym projekty mają szanse na sukces: zaufanie, otwarty dialog, współpraca, kreatywność, dzielenie się pomysłami, rozwiązywanie problemów, podejmowanie decyzji, dotrzymywanie obietnic. 
• Utrzymuj emocje na wysokim poziomie. Nic tak nie wpływa na wartość projektów jak kultura organizacyjna. Spróbuj zrozumieć poziom dojrzałości emocjonalnej organizacji i ciągle go doskonal 
• Nie zapomnij popełniać błędów….
• Ludzie ponad procesy. Stwórz i utrzymuj społeczność – jednolite ciało indywidualności,zespół, który dzieli wspólne interesy i współpracuje. 

3. Brak zrozumienia skali i złożoności projektu
Organizacja starannie przeanalizowała skalę i złożoność projektów upewniając się, że ich cele są osiągalne. 
• Upewnij się, że zaproponowane ramy czasowe są realistyczne
• Zadbaj, żeby inicjatywy zostały podzielone na wykonalne projekty, a kolejny projekt był rozważany w świetle rezultatów wcześniej zrealizowanych projektów
• Ustal jasne priorytety dla czasu, kosztu i wymogów jakościowych
• Upewnij się, że została zdefiniowana dostateczna liczba punktów kontrolnych w projekcie, zapewniająca zatrzymanie projektu w przypadku zmian w otoczeniu, które uniemożliwiają osiągniecie opłacalnych korzyści biznesowych 
• Mniej świadomość jak ważne jest zatrzymanie projektu, który nie przyniesie opłacalnych korzyści biznesowych

4. Zbyt wiele rozpoczętych projektów 
Bardzo często za dużo projektów jest rozpoczętych, gdyż sponsorzy myślą, że jak projekt jest ważny to trzeba go uruchomić.
• Najlepszy sposób na szybkie zrealizowanie projektu jest jego dobre obsadzenie w zasoby. Mniej projektów w portfelu oznacza więcej zrealizowanych projektów w ciągu roku. Ustal priorytety i rozpoczynaj projekt tylko wtedy kiedy masz odpowiednie zasoby.

5. Brak elastyczności / adaptacyjności
Przewiduj niespodzianki!
“ Organizacje funkcjonują w ciągłym, zmieniającym się, konkurencyjnym otoczeniu, więc zakres może się zmienić, szczególnie jeśli to jest duży project” David West
• Zapewnij, że plany projektowe są na tyle elastyczne, że pozwalają na zmiany wynikające z pojawienia się nowych rozwiązań technologicznych oraz nowych okoliczności 
• Istnieją znaczące korzyści fazowego wdrażania systemów. Podziel projekt na fazy.

6. Mikrozarządzanie

Mikrozarządzanie to jeden z najbardziej kardynalnych błędów sponsora. Kiedy zbudujemy zaufanie pomiędzy sponsorem i project managerem, podzielimy role i odpowiedzialności, regularnie się komunikujemy, mikrozarządzanie nie powinno być problemem.
• Daj uprawnienia zespołowi, zadbaj o budowanie samo-organizujących się zespołów, wewnętrzną motywację i zaufanie.

7. Brak lub niedostateczne zarządzanie ryzykiem – zarówno zagrożeniami jak i szansami
• Zadbaj, żeby decyzje dotyczące projektów, zarówno na etapie rozpoczynania jak i realizacji opierały się o rygorystyczne ocenianie kosztów i korzyści oraz realistyczną ocenę ryzyka
• Upewnij się, że istnieje proces zarządzania ryzykiem projektowym wraz ze zdefiniowanymi osobami, które są uprawnione do podejmowania decyzji w zakresie kosztów, korzyści i zmian ryzyka podczas trwania projektu 
• Zadbaj, aby ocena ryzyka odbywała się na każdym etapie projektu, w szczególności ocena zasadności przypadku biznesowego w świetle zmieniającego się otoczenia. 

8. Brak zaawansowanej wiedzy i umiejętności zarządzania projektami w organizacji
Rozwój wiedzy eksperckiej z zarządzania projektami jest kluczowy. Cała organizacja, zarówno sponsor, project manager jak i zespół powinni mówić tym samym językiem.
• Zapewnij, że zarządzanie projektami jest znaczącą profesją 
• Zapewnij, że dobre praktyki zarządzania projektami są zrozumiałe i przestrzegane w całej organizacji
• Nagradzaj kierowników projektów za realizację celów projektowych z sukcesem
• Zachęcaj kierowników projektów do informowania kierownictwa wyższego szczebla o potencjalnym ryzyku. Zachęcaj do proaktywnego działania, a nie tylko realizowania tego co zostało zaplanowane, również w zakresie przyjętej metodyki zarządzania projektami.

9. Brak lub niedostateczne relacje klient - dostawca
Relacje pomiędzy klientem i dostawcą odgrywają kluczową role w sukcesie projektu.
• Zapewnij, że organizacja utrzymuje bliskie relacje z dostawcami, ale unika nadmiernego uzależnienia się od nich, biorąc pełną odpowiedzialność za postęp w celu osiągnięcia zaplanowanych korzyści 
• Upewnij się, że organizacja zapewnia zrozumienie ról i odpowiedzialności oraz takie same zrozumienie przez wszystkich kluczowych określeń i terminów zakończenia
• Zapewnij, że istnieje ciągły proces zarządzania kontraktami podczas trwania projektu, który pozwala na zmiany w wymaganiach. Celem jest zarządzanie kontraktem, a nie nadzorowanie jego przestrzegania.

10. Brak systemowego dzielenia się doświadczeniami z projektów
Bardzo ważne jest, żeby organizacja wyciągała wnioski z popełnionych błędów, planowała jak może lepiej zarządzać zasobami w celu osiągania większych korzyści w przyszłości.
• Zapewnij, że organizacja przegląda projekty tak szybko jak to tylko możliwe, dzięki czemu doświadczenia projektowe mogą zostać wykorzystane w kolejnych projektach 
• Upewnij się, że przeglądy są prowadzone w atmosferze otwartości, a ich celem jest usprawnienie realizacji przyszłych projektów
• Zapewnij, że retrospektywy odbywają się z poziomu projektu, portfela jak i całej organizacji.

Kilka faktów zamiast podsumowania (źródło: PMI’s Pulse of the Profession)

Cel
81 % efektywnych organizacji (80% projektów kończy się na czas, w budżecie i zakresie) ma aktywnych sponsorów. Tylko 45 % nieefektywnych organizacji ma aktywnych sponsorów.

Strategia
66% inicjatyw strategicznych kończy się sukcesem jeśli ma zaangażowanego sponsora. W przypadku braku zaangażowania sponsora tylko 41 % inicjatyw strategicznych odnosi sukces.

Zmiana organizacyjna
81% organizacji o wysokiej skuteczności wdrażania zmian organizacyjnych deklaruje częste angażowanie sponsora strategicznego do inicjatyw strategicznych. W przypadku organizacji o niskiej skuteczności wdrażania zmian tyko 25% korzysta ze sponsora strategicznego.

Złożoność
Aktywny sponsor jest na drugim miejscu po komunikacji na liście krytycznych czynników sukcesu złożonych projektów.


Tuesday, August 19, 2014

Visual Thinking – why do Project Managers need it?

When I got involved in Doodleledo initiative and started Doodleledo 3City meetings, a kind of networking where we talk, eat, drink and doodle, a few people asked me why I do it?  They could not understand the connection between doodling and the other things I do, which are around project management.  So instead explaining everyone I meet why I’m doodling have decided to write this post.  I was excited  to find out that it’s not only me who understand the importance of visual thinking in our profession, also this month’s theme at ProjectManagment.com is “Visual Project Management”. According to Mark Mullaly, PMP “Project managers have a problem in how we visualize--and visually present--information about our projects. Over time, there has been very little innovation in how we depict and portray information about our projects”. The whole article can be found here. So let’s explore the topic of visualisation in more details.

Visual thinking has been described as seeing words as a series of pictures (Wikipedia). For me visual thinking is the ability to work effectively with the complicated ideas. By unlocking the power of visual thinking we can overcome problems, think more creatively and critically, make better decisions and expand our perspective of what's possible (Visual Thinking Magic).

In times of increasing complexity, competition and constraint, we cannot rely on yesterday’s ideas, products and ways of working. Today’s leaders in order to improve performance need to stimulate creative thinking and unleash the creative potential in themselves and in their teams.

“Albert Einstein believed that the words and numbers — as they are written or spoken — did not play a significant role in his thinking process. Geniuses are constantly making novel combinations. They are always looking for ways to combine and recombine things and ideas in new ways. What’s surprising is that the things they are combining are not new or revolutionary at all — they simply haven’t been combined this way before. When thinking visually, you are constantly combining and recombining things in unique ways. You are looking at the same world as everyone else, but seeing something very different by using pictures to fuse together surprising combinations of thoughts, things and ideas” – Visual Thinking Magic.

The result of doodling during PAM Summit 2014
Although visual thinking is not limited to drawing, drawing plays a crucial role in developing the visual thinking expertise. And what’s the most important, everyone can draw through practicing.

The whole framework can be found on the quoted several times here Visual Thinking Magic website, which I find very interesting and encourage you to explore in more details. For me personally, apart from competencies, mindset and so on,  the environment is very important. How to inspire ourselves and the people around us to be more enthusiastic, creative and passionate? How to create the space to excel?

Let’s start building a culture promoting high creativity ( Source: The Handbook of High-Performance Virtual Teams, page 46; adapted from Nemiro  2004).

Characteristics of a culture promoting high creativity:
1.  Ideas valued
2. Trust, high level of honesty
3. Constructive tension
4.  High level of challenge
5. Collaboration
6.  Freedom
7. Supportive management
8. Sufficient resources
9. Understand work style

As opposed to a culture of low creativity:
1.  Ideas dismisse
2.  Mistrust
3. Unconstructive tension
3. Lack of challenge
4. Competition
5. Lack of Freedom
6. Status quo
7. Insufficient resources and time
More on creativity can be found in one of my previous posts.

5 reasons why we need visual thinking (after “Unfolding the Napkin” by Dan Roam):
  1. Pictures help thinking – make our brain more active. The left brain is verbal and processes information in an analytical and sequential way. Visual processes uses the whole potential of the brain and therefore thinking using pictures engage more number of  cerebral points and activate more nerve fibres.
  2. Pictures make our brain happy. Simple drawings motivate our brain to work, at the same time making it happy.
  3. Thanks to visual thinking we take decisions faster
  4. Visual thinking helps communicating our decisions and visions
  5.  Our teams will implement these decisions more effectively.

As Mike Griffiths,  project management consultant and trainer and also visual thinker, have noticed,  there are some dangers of visual project management because what cannot easily be visualized can often get trivialized or forgotten.“…disagreements and disputes on whether they are internal to a project or external generally don’t transfer well to diagrams and graphs. Categorizing disagreements may be viewed as trivializing them by those they involve, and thus act only to alienate people. Many project variables can be effectively illustrated to help communicate a better shared understanding. Other topics are more delicate and need personal handling and discretion”.
Mike advises to “abstract difficult-to-visualize project activities like decision making and consensus building up one level to something that can be made visible like cycle time. Slow decision making and poor consensus-building steps will stifle an otherwise productive project. Stakeholder arguments and political standoffs have resulted in many a failed project. Graphing decision-cycle time or change-request cycle time shows the average time taken for a change request or decision to flow from inception and capture through discussion and to decision and distribution”. More in the article.

If you want to meet Mike Griffiths in person please join 9th International PMI Poland Chapter Congress, Warsaw, 24-26 Nov 2014.


So, let’s start our path to become a visual thinker and start doodling! To join our next Doodleledo meeting please follow us on Facebook or contact me here.

Sunday, July 13, 2014

PAM Summit 2014 - 7 habits of successful Agile PM and more...

End of June I spent a few days in the most beautiful (after Gdansk of course) city of Poland Cracow. I was invited by a local PMI branch to attend a project and analysis management event – PAM Summit.
I must admit that I like this kind of events where not only Project Managers, but also other professions meet together. This is an excellent opportunity to boost collaboration between PMs and Business Analysts as in reality we cooperate a lot.

The conference kicked off by Ryszard Kolodziej, PMI Cracow Branch Director and Agnieszka Gasperini, past PMI Poland Chapter President, started at 9:00 a.m. on the 23rd of June and gathered 300 participants in Stara Zajezdnia Kraków by DeSilva - an old tram switching station, renovated and adapted to a huge conferencing complex. 12 speakers, including Pierre E. Neis, Mark Smalley, Agnieszka Gasperini, Paul Turner, Pawel Felinski, Adrian Reed, Ewa Malia, Darryl Booker, Bartosz Grucza, Leigh Moyle and Paul Wilkinson presented on the first day and during the second day a few workshops were delivered, one of them by  Arie van Bennekum. In this post  I’m not planning to cover all of them, just to highlight a few ones.

Sander Hoogendoorn, Principal Technology Officer & Global Agile Thoughtleader at Capgemini (Netherlands) in his keynote opening session: Breaking Bad. Seven successful habits of successful Agile Project Managers explained why project managers are seen as overhead by development teams and what can be done to change this perception.  

These 7 habits of successful Agile PM are:
  1. Process will not save you.
  2. We are not manufacturing. We are using the wrong metaphors! For example: How long do you need to build this feature? Software development is a creative process and it is very much non-linear!
  3.  Facilitate not dictate! Self-organisation is hard.
  4. Allow the team to learn. “Well, of course software is different, and more complex than anything people have ever before attempted to engineer. But that’s why we have to loosen our structures, not tighten them. That’s why we must learn from any place we can, any way we can”. Gerald Weinberg, 1982.
  5. You are a part of your team. Ask your team how you can contribute.
  6. Trust the metrics. Those who do the work, do the estimate. Track the items, not the ETC’s. With creative work estimates are rarely linear. The world isn’t linear, so we need to learn to live with ambiguity!
  7. Manage the environment. Keep the politics out of the team, but don’t hide the politics from the team!

Adrian Reed, Principal Consultant at Blackmetric / President at IIBA UK (UK), in second key note speech “Avoiding the dark, dead-ended rabbit holes: The importance of BA and PM collaboration before a project is initiated” stressed that successful projects need a clear direction and a definitive destination. This starts with a solid understanding of the business problem or opportunity that exists.
Some tips:
Project concept summary: WHY? WHAT? HOW?
WHY? Define problem statement.
WHAT? Define roles and goals. Define scope. CSF/KPIs
HOW? Prepare solution options.



Leigh Moyle, CEO at PMgurus, Entrepreneur, in presentation tilted “Getting the monsters out from under the bed - a new look at Risk Management” started from an age old story we are taught from childhood, suspecting there is a bad thing about to happen a wolf, dwarves, giants or some ugly stepsisters causing a drama of one kind or other. And then presented strategies and some of the psychology behind identifying, analysing and effectively dealing with potential negative events in a way that will help you minimise fear and maximise effectiveness in dealing with risks in your projects and in your life.

Tips: Understand how big is your monster and the choose the strategy. In the end of the day it might appear much smaller as you thought. More on risk attitude, the chosen response to risk and the psychology behind in one of my previous posts.



Thank you very much Agnieszka Kulczynska, PM of the event, and the whole great PMI Cracow Branch Team for making this happen and inviting me. I really enjoyed it and waiting for next year.